Saudi Aramco


Saudi Aramco
Saudi Arabia

Problem:

  • Improve efficiency and reliability of the plant
  • Monitor and display electrical distribution system parameters for efficient operation and predict effect of changes

Solution: "Power System Monitoring & Management System"

  • Model the Ras Tanura Refinery from the old documentations and resources
  • Power System Managmenet System was installed for monitoring, alarming, event playback, state and load estimation, etc.
  • Performance calculation for the entire refinery power distribution and generation system including the 480 volt load centers