Shree Cement Plant


Shree Cement Plant
India

Problem:

  • Hight reliability of production systems has been a pressing issue
  • There is a high cost of unnecessary downtime and it is vital to have some system in place to help protect power system interruption and ensure continued productivity

Solution"Intelligent Fast Load Shedding" & "Power System Monitoring"

  • Co-Generators were modeled with their dynamic parameters including exciter/governor
  • Multiple scenarios were created to study the stability of the system
  • Stability limits of the generators w/o the utility were studies
  • Customer's power system network was utilized with the "Power System Management & Monitoring" solution (PMS)
  • Customer's power system network was utilized with the "Intelligent Fast Load Shedding" solution (ILS) 
  • Customer's power system network was utilized with the "Automatic Generation Control" solution (AGC)
  • Customized load shedding scenarios with all possible incidents (triggers) were defined and studied
  • Real-time data communication was established with the facility to collect the required parameters
  • Smart predictive analysis helped customer to preserve critical loadings, detecting potential threats and balancing the generation and much benefiting from efficiency and cost savings 
  • Customer is successfully overcoming unwanted outages, failures, incidents and the maintaining the stability of their electrical system